Proof artifact
Verifiable compliance matrix
GovCon buyers trust artifacts more than claims. Download the same .xlsx schema we deliver on Pilot Sprint—then spot-check source references before you share anything upward.
Live run · public solicitation
140G0326R0003 — Scientific and Geophysical IT Support Services
Generated 5/25/2026 from the full 6-file package (Provisions, SOW, SF1449, FISMA, 508, ATTACHMENT-EXP). 212 requirements · Step 1 phase gate · 6 canonical Step 1 volumes.
Programmatic excerpt verification: 61% of LLM-verified rows matched ingested PDF text (121/199). Gap rows flagged for human follow-up: 13.
Spot-check 1 · Set-Aside
Open Sol_140G0326R0003.pdf page 2 — confirm SDVOSB set-aside language matches the matrix row.
Sol_140G0326R0003.pdf · p. 2
Excerpt: “This opportunity is set aside for Service-Disabled Veteran-Owned Small Business (SDVOSB).”
Spot-check 2 · GS2150-1 · Case Reports
Open Provisions PDF page 4 — verify two ATTACHMENT-EXP case reports are required for Step 1.
140G0326R0003_Provisions__Eval__Instructions_and_Clauses.pdf · p. 4
Excerpt: “Submit the ATTACHMENT-EXP data sheet and narrative information as indicated on that form.”
Spot-check 3 · SF1449 Blocks 17 & 30
Open Sol_140G0326R0003.pdf page 3 — confirm Block 17 firm info and Block 30 signature required with Step 1.
Sol_140G0326R0003.pdf · p. 3
Excerpt: “Offerors shall fill in Block 17 firm information, and sign (Block 30) of this SF1449”
Spot-check 4 · 508
Open 140G0326R0003_508.pdf — confirm accessibility deliverable requirements are captured in IT_SECURITY pass rows.
140G0326R0003_508.pdf · p. 1
Excerpt: “Section 508”
Spot-check 5 · FISMA
Open 140G0326R0003_FISMA.pdf — cross-walk FISMA moderate control checklist items to IT_SECURITY pass rows.
140G0326R0003_FISMA.pdf · p. 1
Excerpt: “FISMA”
Spot-check instructions
Open the .xlsx and verify these rows against your solicitation package—or request the PDF snippet after entity verification.
Step 1 · L-2(c)(1)
Open this row and verify page 34 in the solicitation snippet for ATTACHMENT-EXP case reports.
[REDACTED]_GS2150-1_Provisions.pdf · p. 34
Step 2 · M-3.1
Confirm Technical volume mapping to PWS tasks 3.1–3.4 on page 8 of the PWS attachment.
[REDACTED]_PWS_Amd1.pdf · p. 8
Step 3 · FISMA
Note the gap row: J-8 referenced but not in initial upload—how we flag human follow-up before draft.
[REDACTED]_Sol_Amd2.pdf · —
Redacted PDF snippet for spot-check: available on request after UEI/CAGE verification, or add /samples/REDACTED_Sol_snippet.pdf to enable direct download.
Column schema
Evaluator-facing traceability fields—every live Pilot Sprint row includes these columns.
| Column | Definition |
|---|---|
| Ref/Section | Section L/M or FAR clause identifier from the solicitation. |
| Requirement | Verbatim or summarized requirement text evaluators will trace. |
| Compliance Strategy | How the offeror will comply—assigned before narrative draft. |
| Priority | High / Medium based on evaluation impact and deadline risk. |
| Source Document | PDF filename from the solicitation package for spot-check. |
| Source Page | Page reference for click-to-verify QA. |
| Verification Status | verified · gap · pending—never auto-filled from open web. |
| Volume Assignment | Technical, Management, Past Performance, or admin volume owner. |
Low-risk evaluation paths
Mission-critical IDIQ responses rarely pilot immature vendors first. Start with one of these paths—no live capture data required until NDA and entity verification.
Public solicitation demo
We run a published synopsis or open RFP through the same extraction pipeline—no client data.
Redacted Section L trial
Send redacted Section L only after UEI/CAGE verification; we return a bounded matrix excerpt.
Sandbox matrix (download)
Download the redacted .xlsx below and spot-check source document + page references.
Amendment diff
See how matrix rows refresh when mods drop—described in our anonymized case studies.
View outcomes
Anonymized pursuit outcomes and metrics live on the outcomes hub.